Communities

Operations

HOA Architectural Review Application Template

The ARC application is the front door of the architectural review process. A clean form keeps decisions consistent across boards, gives the committee what it needs to decide on the merits, and creates a paper trail when an unhappy owner challenges a denial.

When to use

Use whenever an owner proposes an exterior change requiring ARC approval under the Declaration or Architectural Guidelines — typically paint colour, fencing, roofing, additions, landscaping changes, and similar.

How to use this template

  1. 1

    Customise the categories list to match the modifications your Architectural Guidelines actually cover.

  2. 2

    Specify the response window your guidelines provide — many state statutes set a default (often 30-60 days) if the guidelines are silent or longer than the statutory cap.

  3. 3

    Require drawings, photos, and the contractor's licence on file before the clock starts. Incomplete applications shouldn't trigger the response deadline.

  4. 4

    Make the ARC's decision document referenceable in the violation notice flow — "Application #[ID] was denied on [DATE] for the reasons stated" beats free-form prose later.

The template

[HOA NAME]
ARCHITECTURAL REVIEW APPLICATION

Application #: [ASSIGNED ON RECEIPT]
Submitted: [DATE]

────────────────────────────────────────────────────────
OWNER INFORMATION

Name:           ____________________________________________
Property:       ____________________________________________
Lot / Unit #:   _________________
Phone:          _________________     Email: _______________
────────────────────────────────────────────────────────

PROPOSED MODIFICATION

Category (check all that apply):
  [ ] Exterior paint / staining        [ ] Roofing replacement
  [ ] Fence — new or replacement       [ ] Driveway / hardscape
  [ ] Landscaping — significant        [ ] Solar / battery
  [ ] Addition / structure             [ ] Window / door change
  [ ] Other: ______________________________________________

Description (narrative):
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________

Materials / Colours / Specifications:
_____________________________________________________________
_____________________________________________________________

Estimated start: [DATE]      Estimated completion: [DATE]

────────────────────────────────────────────────────────
CONTRACTOR (if applicable)

Company:        ____________________________________________
Contact:        ____________________________________________
Licence #:      _________________     State: _____________
Insurance certificate enclosed: [ ] Yes  [ ] N/A
────────────────────────────────────────────────────────

REQUIRED ATTACHMENTS

  [ ] Site plan or plat marking the modification location
  [ ] Drawings or photos of the proposed work (front view + relevant
      adjacent views)
  [ ] Material / colour samples (or links / brand specifications)
  [ ] Neighbour acknowledgement, if required by Section
      [GUIDELINES SECTION CITE]
  [ ] Application fee, if any: $[FEE]

────────────────────────────────────────────────────────
OWNER ACKNOWLEDGEMENT

I acknowledge that:

1. I will not begin work until I receive written ARC approval (or the
   guidelines' response window has expired without a decision, where
   that is permitted).

2. The work will conform to my Declaration, the Architectural
   Guidelines, and any conditions the ARC attaches to the approval.

3. Approval is for the work described in this application; material
   changes require a new application.

4. If the ARC denies the application, I may request reconsideration in
   writing within [RECONSIDERATION WINDOW] days of the denial.

Signed:  _______________________________   Date: ______________
         [OWNER SIGNATURE]

────────────────────────────────────────────────────────
ARC USE ONLY

Received:  ____________  Complete: [ ] Yes  [ ] Incomplete (explain)
Decision:  [ ] Approved  [ ] Approved with conditions  [ ] Denied
Decision date: _______________
Conditions / Reasons:
_____________________________________________________________
_____________________________________________________________
ARC Chair signature:  __________________________________________

cc: ARC file · Owner · [PROPERTY MANAGER]

Review with counsel before adopting. Several states (notably California's solar-rights statute, Texas's protected-improvement statutes) limit what an ARC can deny and prescribe response windows. Solar, flag, and religious-display requests have specific statutory protections in many states.

Templates are generic. Your community isn’t.

Get this letter with your section cites filled in.

Upload your CC&Rs and Bylaws once — then ask the bylaw concierge for the exact section reference, cure window, or hearing right that should appear here. Free under 250 homes.

Run an HOA? Free for boards under 250 homes.

Ask unlimited bylaw questions with citations back to the exact section and page in your governing documents.

Get started